Main stages of repair works in the home

Main stages of repair in the apartment.

How to start repair works of the apartment?

The very first phase of the repair of old apartment or condos is the destruction and dismantling to start with of the shabby walls and partition walls, removing the wall and ceiling coating. This stage is among the most "unclean" stages of the repair work.

One more among the most essential and "dusty" works is the window block replacement. It is necessary to do this first off since dirt and dust will be unallowable throughout following stages and it is restricted at all to open windows throughout painting and wallpaper works (large drops of the temperature and moisture are unallowable). After mounting windows and windowsills it is required to load them immediately in polyethylene film and to cover windowsills in addition by the fiberboard (in order to prevent scratches).

The following phase is circuitry. Electrical wiring can be set up in walls or along the floor. Wiring is made inside the pipelines to guarantee electrical security and increase reliability. The pipe safeguards wiring from external damages and allows to replace the wire entirely without breaking walls and floor merely by placing the brand-new wire rather of the old one.

House Painting follows the electrical wiring. The frequent mistake during the simultaneous conducting of such works happens when workers forget to set out among the cable televisions and home painters have already plastered and ravelled the wall. As an outcome, extra works are necessary to seal goes after on the ended up wall. The locations of the feed switch and wall outlet location and their number need to be thought-out beforehand. The scheme of power wiring is normally included into the design project.

Later on the system should be prepared to service in case of failures. In addition to the electrical wirings, the telephone cable and the television cable are set out. The power cable ought to not be set out near the telephone and antenna cables to prevent sound pickup and disturbance. The most strange minute is laying out the TV cable. In order to make 2 (or 3) television set in the apartment or condo the 2nd cable television is typically just "strongly soldered" in parallel, so the cable resistance is reduced. As a result, the screen quality is deteriorated, many programs can't be gotten and etc. In order to prevent such circumstance it is needed to invite a professional with unique devices. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.

Painting is the most long-term procedure, that is why it is conducted at the same time in all properties, if it is possible. Delays are related to the innovation. Each used layer of the plaster (or filling in finishing) must dry completely before the work will continue.

Works in hygienic plans and the kitchen area start concurrently with home painting. It is much better to meet so-called "unclean" works in the home repair article first place and simultaneously. In accordance with the strategy of the hygienic specialist place welding, wall chasing and pipeline run are conducted. Steam radiator admissions are prepared, taps and brackets are mounted, but radiators are not installed.

image

Then works in hygienic plans are carried out according to the strategy. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The following phase is putting together ceiling and laying tiles on the floor. And at last other sanitary gadgets, mixers and accessories are mounted.

After circuitry, installation of rosette plates and terminal boxes the voltage is signed in all point. Ends of wiring are insulated and laid out into rosette plates. Sockets and breakers are not set up during this stage in order to conserve their surface look. The finish puttying of walls is performed concurrently. The technically exact control of drying of the layer of the plaster (filling) is performed tips for home repair by drymeter. It is an unique instrument that determines wetness of the material.

The following phase is the process of fill. Fill can be made with different materials-- from usual masonry cement-sand mix to self-aligning floors. The benefit of the simple mixture is its cheapness, the drawback is that such mix is much more difficult lined up at the level and the last dry time of such fill is 40 days, just then the next stage of the deal with flooring can be performed, i.e. the duration is too long. Self-leveling self-aligning floors are far more costly, however more technological. Aligning occurs nearly "automatically" i.e. fluid option of mixture is poured out, then it runs and you receive the horizontal surface area. The final dry time is 15 days i.e. you have considerable time economy. The system "warm floor" is installed into the fill. If the so-called "damp procedures" are inapplicable the technology of the dry lining up (the fill innovation) is used bases for floors with adjustable floor battens are mounted.

After fill door boxes and door are set up. Installation of doors must take into the account thickness of future floor covering. After installation the door can be taken off its hinges and got rid of till the end of repair work or loaded into polyethylene movie to protect from damages. Simultaneously ceiling can be painted and the tile can be laid in that premises where it was prepared. The tile should be laid on the absolutely dry overlay.

Finishing of the floor installing depends on the prepared covering. Most of the times (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the flooring by self-tapping screws. One plywood sheet is fixed by 30-50 self-tapping screws to offer the close fixing of plywood and long-term service of the flooring without squeak and bulging. The plywood offers the extra heat- and acoustic insulation. After mounting of the plywood is completed, wallpaper for painting can be pasted on walls.

In properties where finish covering of the floor is laminated flooring or parquet stockpile, the normal wallpapers are pasted (not for painting) in the very first place. Then the flooring covering is mounted.

If finish covering of the flooring is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the regular wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The mentioned effect is connected only with such scrambling procedure when the excellent amount of dust is produced. In spite of the truth that good flooring grinders are geared up with the vacuum, the enough quantity of dust is sped up on surrounding topics consisting of walls. Dust is extremely acerbic and is badly washed off. That is why in order not to damage wallpapers, they are pasted after rushing and in order the parquet do not soak up the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.

After this the primary works can be considered to be ended up. It is left only to set up the plinths, ornamental elements, breakers and sockets, curtain holders, to hang doors, plant-bands and others.

In conclusion it is required to keep in mind that the series of works was listed in general and can alter depending upon the certain scenario-- the number of spaces in facility, your resources, peculiarities of the building of the multilevel facilities. It is based on sound judgment and every person capable of analysis can independently develop such a sequence.